The Point Luas stop,the easternmost terminus of the docklands extension of the Luas Red Line light rail system, is located in the middle of the Point Village complex. This Luas link to Tallaght connects the Point Village to other transport options, including the DART, suburban rail, Busáras, mainline rail, and the future Dublin Metro. The Dublin Port Tunnel southern portal is located nearby.
The Point Luas stop,the easternmost terminus of the docklands extension of the Luas Red Line light rail system, is located in the middle of the Point Village complex. This Luas link to Tallaght connects the Point Village to other transport options, including the DART, suburban rail, Busáras, mainline rail, and the future Dublin Metro. The Dublin Port Tunnel southern portal is located nearby.
The main building of the development - now branded as Point Square - containing the retail, hotel and cinema elements as well as office space - was completed prior to the post-2008 Irish economic downturn, however the retail element did not open except as an entry to the cinema.
Dunnes Stores had agreed to be the anchor of the retail element, but has delayed opening the store for more than a decade, appealing repeated legal demands to do so. Some of the internal units are to be combined and converted to health or leisure units due to continued low demand for retail.
The office space has been taken by Oath, moving some operations from their main location at East Point Business Park, and Voxpro.
The hotel element of the development operates as The Gibson Hotel, opened in June 2010 and including nine suites, with access to terrace gardens. It also includes a spa, gymnasium, two outdoor hot-tubs and large conference facilities.
The 73m Exo Building is, as of 2022, under construction on the site of the cancelled Watchtower Building at the Eastern end of Point Village.